Range covered
The protected time covers the upper end of the house planning range. Keep the sessions apart and rotate the work selected for review.
Plan the monthly reviewTurn one task lane's work volume, risk, review time, and item-check time into one to three review sessions. The tool plans workload. It does not calculate statistical confidence or guarantee that every problem will be found.
Volume, risk, task state, review time, check time, and sessions.
Place routine checks apart during the week.
The calculation stays in your browser tab.
Use finished units that can be checked against an approved result. Run the planner again for another task type or reviewer.
Your numbers stay in this browser tab. This tool does not save or submit them.
Steady standard work uses a 3% to 5% range. New or changed elevated-risk work uses 8% to 12%.
These percentages are OutsourcedU planning assumptions, not benchmarks or a statistical standard. Contracts, service levels, incident rules, and legal or regulatory duties take priority.
The scheduled sample does not include time for investigation, corrections, coaching, policy changes, or required exception reviews.
If time falls short, the result shows the gap. Do not treat unchecked work as approved.
The protected time covers the upper end of the house planning range. Keep the sessions apart and rotate the work selected for review.
Plan the monthly reviewThe protected time reaches the smaller target but not the full range. Start with required exceptions, changed work, and recent misses.
Assign backup coverageThe protected time falls below the lower target. Review required exceptions first, then add review time or narrow the routine sample.
Check manager capacity